Ancients and the Flame
Reports On Ancient Constructs
Lore from the journal's Ancients and the Flame pages: 2 entries, read at 2 places in Cinder's Cradle and Nomad Highlands.
Where it is read
Construct pipeline status is satisfactory. Approval for large-scale production has been granted for the following models:
Worker Constructs M.I.N.R. - Metallurgical, Industrial and Nonmetal extraction Rig (3rd gen.) B.L.D.R. - Building, Landscaping, and Demolition Rig (3rd gen.) G.T.H.R. - Grunt Transportation and Hauling Rig (2nd gen.)
Security Constructs S.I.R.N. - Signal and Intrusion Reveal Node (Includes: Static, Mobile)
Combat Constructs G.A.R.D. - Guarding and high Alert Resolution Defender (Includes: Burner, Slicer, and Dozer variant) G.U.N.R. - Gunnery and Ultrasonic Neutron Rocketcore (Includes: Short, Medium, Long Ranged variant)
Approval remains pending for the following models
Security C.R.T.R. - Construct Reconstruction and Termination Rig
Findings The C.R.T.R. fulfills its duties as a small maintenance and reconstruction unit, but it does not reliably terminate faulty constructs.
The following model has not been approved for mass production:
Security S.P.D.R. - Security Patrol Dome Rig
Findings The S.P.D.R. continues to demonstrate far too significant destructive potential when operating in an alarm state.
- Artificer Constantio
Construct rigs were exchanged successfully. The Worker's Ward is now fully equipped with 3rd-generation models. Please find additional information attached below.
Worker Constructs M.I.N.R. The new Metallurgical, Industrial, and Nonmetal extraction Rigs have elevated efficiency by about 34%. This productivity increase is largely attributable to the Archaic Core additions, which enable new models to recharge at Charge Stations.
G.T.H.R. New Grunts (Transportation and Hauling Rigs) were deployed. The process of gathering, transporting, and storing sediment and ore has been streamlined.
C.R.T.R. The Construct Reconstruction and Termination Rigs were deployed for improved rig maintenance.
Results are satisfactory. Implementation approved. Seeing as this report is finished, I'll withdraw to my chambers once more to conclude my own research - please do not disturb me. The entry is concealed for a reason.
- Artificer Constantio
Lore
Category
Entries
Read in